在线观国产精品日韩av_在线播放国产精品一区二区_在线播放日韩中文字幕_在线播放国产午夜精品探花_在线播放国产麻豆_在公车被灌强行满jing液视频_精品伊人久久久99热这里只

歡迎您訪問濟(jì)南龍?jiān)澜ú挠邢薰揪W(wǎng)站!
山東溝蓋板的安裝事項(xiàng)包括哪些?
來源:http://gravoaliva.com/ 時(shí)間:2023-10-27 瀏覽量:0
清理好排水溝內(nèi)部的雜物,保持溝內(nèi)排水順暢。在清理時(shí)可以使用清理工具來進(jìn)行,把溝內(nèi)的泥土以及雜物清理干凈。
Clean up the debris inside the drainage ditch to ensure smooth drainage. During cleaning, cleaning tools can be used to clean the soil and debris in the ditch.
選擇合適的排水溝蓋板,根據(jù)排水溝的尺寸來選擇合適的尺寸大小,根據(jù)實(shí)際的使用環(huán)境來選擇合適的材質(zhì)。確定好蓋板的安裝位置以及數(shù)量,根據(jù)實(shí)際需要,選擇合適的蓋板來覆蓋排水溝。
Choose a suitable drainage ditch cover plate, choose the appropriate size based on the size of the drainage ditch, and choose the appropriate material according to the actual usage environment. Determine the installation position and quantity of cover plates, and select suitable cover plates to cover the drainage ditch according to actual needs.
把蓋板放置在排水溝安裝位置上,安裝時(shí)要調(diào)整好位置,保證蓋板與排水溝連接緊密。
Place the cover plate in the installation position of the drainage ditch, and adjust the position during installation to ensure that the cover plate is tightly connected to the drainage ditch.
山東溝蓋板
此外,安裝時(shí)還需注意支架錨固件必須牢固埋在水泥層內(nèi);溝兩側(cè)的支撐面必須平整牢固;主筋方向?yàn)槌兄兀ㄖ危┓较?,承重筋要橫跨地溝,兩端要長出地溝內(nèi)徑至少5公分,確保安全;按溝長排版,蓋板外徑實(shí)際要小1-2mm,以便安裝方便;根據(jù)地溝跨度和承載要求選擇蓋板的型號等事項(xiàng)。
In addition, during installation, it is also necessary to pay attention to the fact that the bracket anchor must be firmly embedded in the cement layer; The supporting surfaces on both sides of the ditch must be flat and firm; The main reinforcement direction is the load-bearing (support) direction, and the load-bearing reinforcement should cross the trench. Both ends should extend at least 5 centimeters beyond the inner diameter of the trench to ensure safety; Arrange according to the length of the trench, and the outer diameter of the cover plate should be 1-2mm smaller for easy installation; Select the model of the cover plate based on the span and bearing requirements of the trench.
排水溝蓋板安裝的步驟包括:
The steps for installing the cover plate of the drainage ditch include:
開挖基槽:開鑿足夠?qū)挾鹊臏锨?,確保至少8cm的空間能夠用于放置排水溝。由于承重等級及地上不同的鋪裝方式,對應(yīng)不同的尺度要求,不銹鋼排水溝的基槽開挖也要依據(jù)具體要求進(jìn)行改變。
Excavation of foundation trench: Excavate a trench with sufficient width to ensure that at least 8cm of space can be used to place drainage ditches. Due to the different load-bearing levels and paving methods on the ground, corresponding to different scale requirements, the excavation of the foundation trench for stainless steel drainage ditches also needs to be changed according to specific requirements.
安置出水口:施工中一般從跌水井或許其他類型接水口開端。確認(rèn)好開始方位后,依照溝體兩邊顯現(xiàn)的水流方向進(jìn)行裝置。確認(rèn)排水口的方位和形式;安放跌水井;在確認(rèn)排水溝方位和裝置高度正確后,進(jìn)行與市政水井的連接;從接水口處開端依照溝體的旁邊面的水流方向進(jìn)行裝置,假如溝體兩邊顯現(xiàn),關(guān)于有斜度的溝體,溝體旁邊面所示數(shù)字顯現(xiàn)水流方向,流水的方向事先要裝置好,否則后期的水流就會(huì)遭到影響。
Installation of water outlet: During construction, it usually starts from a drop well or other type of water outlet. After confirming the starting direction, install according to the water flow direction displayed on both sides of the ditch. Confirm the orientation and form of the drainage outlet; Install a drop well; After confirming the correct orientation and device height of the drainage ditch, connect it to the municipal water well; Starting from the water inlet, install according to the direction of water flow on the side of the ditch. If there is a slope on both sides of the ditch, the number on the side of the ditch shows the direction of water flow. The direction of water flow should be installed in advance, otherwise the later water flow will be affected.
蓋板裝置:為避免溝壁在施工時(shí)遭到側(cè)向壓力的損壞,在鋪設(shè)和澆筑混凝土前應(yīng)預(yù)先將蓋板放置與溝體上,或許用同等尺度的木板支撐溝體。在溝體相鄰的混凝土澆筑過程中,確保混凝土與溝體間無空地,與溝體構(gòu)件緊密連接。確保在裝置過程中,制品排水溝不受機(jī)械損害。
Cover plate device: To avoid damage to the trench wall caused by lateral pressure during construction, the cover plate should be placed on the trench body in advance before laying and pouring concrete, or the trench body should be supported by boards of the same size. During the pouring process of concrete adjacent to the trench, ensure that there is no open space between the concrete and the trench, and that it is tightly connected to the trench components. Ensure that the product drainage ditch is not mechanically damaged during the installation process.
這些步驟完成后,排水溝蓋板的安裝就完成了。
After these steps are completed, the installation of the drainage ditch cover plate is completed.
相關(guān)產(chǎn)品
相關(guān)新聞

聯(lián)系人:鞏經(jīng)理 手機(jī):13905418708/18254189888
辦公室地址:濟(jì)南章丘區(qū)刁鎮(zhèn)瑞祥路5號
廠區(qū)地址:濟(jì)南章丘區(qū)棗園街道吉祥村工業(yè)園
備案號:魯ICP備2023005268號-1 網(wǎng)站地圖    TXT    XML

乌恰县| 嘉荫县| 汉川市| 乌鲁木齐市| 屯门区| 大足县| 台江县| 白水县| 安多县| 枞阳县| 雅江县| 靖西县| 牙克石市| 清水河县| 海安县| 大渡口区| 普兰县| 无为县| 柘荣县| 缙云县| 虹口区| 疏附县| 遵义市| 五华县| 睢宁县| 洞口县| 固镇县| 芷江| 绥江县| 兴安盟| 巴中市| 南皮县| 闸北区| 北海市| 名山县| 新营市| 新河县| 晋中市| 鹤峰县| 宜城市| 泰安市|